LMS 2.6 pushing new IOS to Stack 3750's

Unanswered Question
Feb 8th, 2007

I need to upgrade IOS on my 3750's in a stack configuration. If I push the new IOS (with RME) out to the master will it filter down to all the other slave switches? There is only 1 management IP address for the stack (of 5 switches) and LMS sees that as a stack of 5 as well. Will this mean that if I push the new IOS to the master it will copy to all the others? If not, please advise on how to perform this upgrade. Thanks

Also for SNMP, I have another question for the experts out there. If I just use the "logging 10.x.x.x" command do you still have to specify snmp traps? or does this log all?

I have this problem too.
0 votes
  • 1
  • 2
  • 3
  • 4
  • 5
Overall Rating: 0 (0 ratings)
Loading.

Actions

This Discussion