Adding Redundant Supervisor Engine's to 6509's

Unanswered Question
Feb 8th, 2007

Hi,

I am in the process of adding redundant sup1, sup2, and sup720 engines to our current 6509 switches. So far we have seen a brief loss of connectivity to traffic traversing a switch during the hot-insert of a new supervisor card. This outage causes problems to the application servers connected to these switches.

Is this a known issue and is there any way to minimize this outage?

Thanks,

Matt

I have this problem too.
0 votes
  • 1
  • 2
  • 3
  • 4
  • 5
Overall Rating: 0 (0 ratings)
Loading.

Actions

This Discussion