G.703 Card Installation

Answered Question
Feb 11th, 2007

I have a WAN link between our two sites is coming up that will terminate on VWIC-2MFT-G703 card on both sides. I have 2811 on both sides. When I installed the G703 card, it showed up as E1 controller. For its initialization, I issued the following commands under E1 controller configuration:

channel-group 0 unframed

linecode hdb3

clock source internal

Doing so created a serial interface on the router. I gave the IP to this interface. Do I need to do anything else before terminating the circuit?? Thank You in advance.

Sheeraz

I have this problem too.
0 votes
Correct Answer by spremkumar about 9 years 7 months ago

Hi

This minimal config is enough to get started..

Once you have ur line terminated you can check the status of the line including errors/reliability etc.,

regds

  • 1
  • 2
  • 3
  • 4
  • 5
Overall Rating: 5 (1 ratings)
Loading.
Correct Answer
spremkumar Mon, 02/12/2007 - 02:04

Hi

This minimal config is enough to get started..

Once you have ur line terminated you can check the status of the line including errors/reliability etc.,

regds

Actions

This Discussion