burn-in test results

Unanswered Question
Mar 6th, 2007
User Badges:

I am doing burn-in of some new C3750 switches. I've been asked to provide "burn-in" test results.


Does "sh logging buffered" suffice for results for this request?


or


should a "diagnostic start switch x test all" be done and then save THOSE results?


Thanks for any input.

  • 1
  • 2
  • 3
  • 4
  • 5
Overall Rating: 0 (0 ratings)
Loading.
fmeetz Mon, 03/12/2007 - 12:29
User Badges:
  • Bronze, 100 points or more

C3750 switches 24 hour Burn-In: test unit under high temperature (40 C) external looping of ports sending and receiving random packet data - PASSED.


Actions

This Discussion