ATM VBR-NRT

Unanswered Question
Mar 7th, 2007
User Badges:

When I modify or remove vbr-nrt command for a configured PVC the traffic stops passing through.It started happening with 7600 router earlier with 7200 it never use to happen

Is their a workaround other than restart or recreation of pvc.

  • 1
  • 2
  • 3
  • 4
  • 5
Overall Rating: 0 (0 ratings)
Loading.
Danilo Dy Wed, 03/07/2007 - 20:43
User Badges:
  • Blue, 1500 points or more

vbr-nrt peak_cell_rate sustainable_cell_rate


It happens in 7200 and 7500 also but only for a few seconds and is always not noticeable from the user end. I never remove them to change the value, I just re-type the new value as it will override the existing value. Removing them will have longer downtime.


If however you are changing PVC VPI/VCI value, then there will be downtime.

tahseen12 Wed, 03/07/2007 - 20:55
User Badges:

No Dear i tried without saying no I mean just overwriting the existing with new value and its the same problem and its not for few seconds it for long time.

Also it never use to happen with 7200 only with 7600.


Danilo Dy Wed, 03/07/2007 - 22:53
User Badges:
  • Blue, 1500 points or more

I just tried it in 7600 and its a few seconds only. Now, I have tried and find that doing it in 7200, 7500, and 7600 is only a few seconds. Well, maybe there is a difference depends in country or telco :)

Actions

This Discussion