%C4K_REDUNDANCY-5-CONFIGSYNC

Unanswered Question
Apr 2nd, 2007
User Badges:

We are getting this message every hour, how can we stop it without affecting the switch (4507R) operation..


Apr 1 09:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Apr 1 10:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Apr 1 11:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Apr 1 12:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Apr 1 13:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Apr 1 14:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor


Thanks in advance..

  • 1
  • 2
  • 3
  • 4
  • 5
Overall Rating: 0 (0 ratings)
Loading.
Jon Marshall Mon, 04/02/2007 - 14:11
User Badges:
  • Super Blue, 32500 points or more
  • Hall of Fame,

    Founding Member

  • Cisco Designated VIP,

    2017 LAN, WAN

Hi


This message is level 5 in syslog ie. notifications. If you want to stop seeing it you can raise your logging level to warnings but be aware that you may miss other information you would like to see.


Attached is link to all 4500 redundancy syslog messages and their levels.


http://www.cisco.com/en/US/products/hw/switches/ps4324/products_system_message_guide_chapter09186a00801d0f38.html#1371982


HTH


Jon

Ahmede Mon, 04/02/2007 - 15:52
User Badges:

Thanks for your response.. I think I intrested more in knowing why we are getting this message every hour and how we can stop rather than hiding it..



situwayne Mon, 04/02/2007 - 16:19
User Badges:

this is interesting. The calendar and VLAN database files are always synchronized when they change. you shouldn't be getting this if nothing is changed.

Actions

This Discussion