cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
1736
Views
0
Helpful
3
Replies

%C4K_REDUNDANCY-5-CONFIGSYNC

Ahmede
Level 1
Level 1

We are getting this message every hour, how can we stop it without affecting the switch (4507R) operation..

Apr 1 09:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Apr 1 10:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Apr 1 11:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Apr 1 12:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Apr 1 13:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Apr 1 14:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Thanks in advance..

3 Replies 3

Jon Marshall
Hall of Fame
Hall of Fame

Hi

This message is level 5 in syslog ie. notifications. If you want to stop seeing it you can raise your logging level to warnings but be aware that you may miss other information you would like to see.

Attached is link to all 4500 redundancy syslog messages and their levels.

http://www.cisco.com/en/US/products/hw/switches/ps4324/products_system_message_guide_chapter09186a00801d0f38.html#1371982

HTH

Jon

Thanks for your response.. I think I intrested more in knowing why we are getting this message every hour and how we can stop rather than hiding it..

this is interesting. The calendar and VLAN database files are always synchronized when they change. you shouldn't be getting this if nothing is changed.

Review Cisco Networking products for a $25 gift card