How to verify the A side and the B side of ICM are in Sync

Unanswered Question

I am running IPCC enterprise 6.0 and I am about ready to move the B side of ICM to our DR location Tx. The B side consists of Rogger B and PG1B and the A side is located in Ca. The B side will be offline for about 10 days.

Can someone please advice what I need to be aware when I bring up the B side in Tx ? How do I verify that the A side and the B side are in sync ?

Any feedback on past experience is highly appreciated !!!!

Thank you very much !!!!

Danny

I have this problem too.
0 votes
  • 1
  • 2
  • 3
  • 4
  • 5
Overall Rating: 0 (0 ratings)
Loading.

Actions

This Discussion