Hi Johnnylingo,
May i know how you setup the multicast for the 2 pair of 6500s core switches?
Currently for my case is that each pair is connected with a trunk (layer 2) running HSRP to provide redundancy, then these 2 pairs are connected (layer 3) together.
basically most of my end users are connected to access switches connecting to one pair trying to access the windows media server which is connected to another pair of core switches.
Would appreciate if you can share your configuration. thanks alot.
-------------
http://www.cisco.com/application/pdf/en/us/guest/tech/tk363/c1501/ccmigration_09186a008015e7cc.pdf
With regards to the design guideline provided, i have read and tested the small campus LAN deployment for my other sites, a question in my mind is:
1) is there a need connectivity between the two loopback interfaces on both core switches?
interface Loopback0
description Interface used for RP/MA
ip address 1.1.1.1 255.255.255.255
ip pim sparse-dense-mode
interface Loopback0
description Interface used for RP/MA
ip address 1.1.1.2 255.255.255.255
ip pim sparse-dense-mode