Hi,
I have a collapsed backbone design with a single C3750G as a core switch and 6 Cat Express 500 switches as access switches.
Q1. Is it possible to cascasde the 6 CE 500 access switches using their uplink ports ?
The first and the sixth access switch will have their uplinks to the core.
Q2. If I do a 802.1q trunk on all the cascade links, what are the spanning tree implications ? Which ones will block ? How do I get around this problem ?
Your help is much appreciated.
Thanks,
Paul