cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
520
Views
0
Helpful
6
Replies

Switching out cisco blades in 9509 and 9513

spwvol1978
Level 1
Level 1

Anybody know where I can find documentation on this issue?

6 Replies 6

groutley
Level 1
Level 1

What issue ?

john.novak
Level 1
Level 1

Is this a replacement or an upgrade??? Issue?

You'll find what your looking for under 'Installing the Cisco MDS 9xxx Series'

We are moving to a core-edge design from a mirrored fabric.

Taking 2 slots out of 9509 which hold clariion fe's and symm fa's and putting them in the new 9513(core)

Switches will be isl together, fabrics merged.

We are using wwpn zoning. 3.02a fw

My question is how will the 9513 get the config for the 2 new blades?

Any tips, pointers?

I have to ask why ?

You are currently running a fully redundant design, and moving to a single fabric, and creating a potential bottle neck being the ISL with hosts on one switch, and Disk on the other switch.

I do not understand why you would want to do this?

We are not moving to a single fabric.

HostX HBA 1-----9509----9513------Storage

HostX HBA 2-----9509----9513------Storage

We will still have 2 fabrics.

G'day,

By moving line cards from chassis to chassis will not magically move configs around.

Zoning info will be fine because you are zoning via wwpn.

You will however, need to ensure each port is placed into the correct VSAN (unless you are using dynamic VSAN's which will mean there is nothing really to do)

From a best practice point of view, you will still need to label ports etc.

Cheers

Andrew

Getting Started

Find answers to your questions by entering keywords or phrases in the Search bar above. New here? Use these resources to familiarize yourself with the community: