Dears
I have two 6509 Switches installed NAM in each one. HSRP is configured beteen the two switches. what is the best practice for NAM deployment ( Fro example can i configure one of NAM as primary and the second as secondary as Failover ? if it possible please send me the configuration guide to achecive this failover configuration