We're looking for the best technology solution to most quickly recover from a single T1 outage, in a dual T1 lease-line setup.

Time sensistive application means we are looking for minimum recovery time from a failure.

I have this problem too.
0 votes
  • 1
  • 2
  • 3
  • 4
  • 5
Overall Rating: 0 (0 ratings)
Loading.
spremkumar Fri, 04/25/2008 - 03:12

Hi

Is it a point to point setup between these two locations ?

if its the case have you configured dual static routes via the leased lines pointing towards the interface on which its terminated ?

Also do throw some light on the current setup you have in place out there.