Writing Macros for a 3750 stack

Unanswered Question
May 28th, 2008

I am looking for documentation, or "How Tos" for writing macros for scheduled actions on a 3750G-24PS-S switch.

Specific need is to shutdown all AP connected ports at a predetermined time, and start them up again around 8 hours later.

Thank you....

I have this problem too.
0 votes
  • 1
  • 2
  • 3
  • 4
  • 5
Overall Rating: 0 (0 ratings)
Amit Singh Wed, 05/28/2008 - 09:23

This will not be achieved by the Macros. You can achieve it with time-based POE EEM script on 3750's. You need to upgrade the switches to the latest 12.2.46SG image and configure the time-based POE script.

Please download the script from the link below :


Look for 6500 Green Power EEM script.

HTH,Please rate if it does.

-amit singh

psiegling Wed, 05/28/2008 - 10:10


Thank you... Got the download. It will be two months before I get the new switches, load the new image, and test.

This tells me we can do it. That is what I needed for now.

Thank you,

Philip Siegling


This Discussion