Installing modules into 6500

g.leonard
Level 1
Level 1

I need to install a 48-port 10/100/1000 line card into a 6506E. Can this be done whilst the switch is up?

The hardware installation guide doesn't indicate either way.

4 Replies 4

andrew.prince
Level 10
Level 10

Last time I checked - yes - they are hot swappable.

HTH>

Giuseppe Larosa
Hall of Fame
Hall of Fame

Hello Gary,

the answer is yes you can insert the linecard without powering off the switch.

Look for OIR capable parts

this is the acronym used by Cisco for on line insertion and removal

use the following link:

http://www.cisco.com/en/US/docs/switches/lan/catalyst6500/hardware/Module_Installation/Mod_Install_Guide/03instal.html

Hope to help

Giuseppe

I would prefer to shutdown the module prior to removal -

However the commands

#hw-module module X shutdown - doesnt work for me - I dont have a shutdown option

also the

#no power enable module X  - doesnt work for supcards (%Error: no power control on supervisor cards)

Do I need to upgrade my software to enable this feature -

running on  s72033-ipservicesk9-mz.122-33.SXI2a.bin

Any ideas ???