Can anyone recommend a procedure for this. We have a unity failover pair VM only running out of space on the C: drive. This is because during the installation the procedure to move the logs and DB to the D: drive was not performed. If I try to detach the databse now it does not succeed, because it is running failover I guess. Anyone know of the best way to get around this with minimal service disruption?

Thanks

Martin

I have this problem too.
0 votes
  • 1
  • 2
  • 3
  • 4
  • 5
Overall Rating: 0 (0 ratings)
Loading.
jasoninbtr Sun, 12/07/2008 - 13:45

Also, do this first on your passive node then failover and do it on the other node.