Giuseppe Larosa Thu, 12/11/2008 - 03:53
User Badges:
  • Super Silver, 17500 points or more
  • Hall of Fame,

    Founding Member

Hello,

I do think so because PBR can be implemented in the TCAM cable so it is part of multilayer switching.

The TCAM has a field for action/nexthop and PBR means changing that parameter.

For example I did tests with fallback bridging with the same amount of traffic and cpu usage was steadily low.


Hope to help

Giuseppe


Actions

This Discussion