Tshi M Wed, 01/21/2009 - 05:05
User Badges:
  • Silver, 250 points or more

how about design3 (see attached). I will enable STP as well.



Attachment: 
colmgrier Wed, 01/21/2009 - 05:10
User Badges:

Thanks for your reply.


The customer only has two fiber links back to main comms room.



Tshi M Wed, 01/21/2009 - 05:17
User Badges:
  • Silver, 250 points or more

totally agree with Jon and if you the customer can't afford additional fiber runs, I will stick with design2. But try to convince the customer to spend some $ on the upgrade.

Jon Marshall Wed, 01/21/2009 - 05:11
User Badges:
  • Super Blue, 32500 points or more
  • Hall of Fame,

    Founding Member

  • Cisco Designated VIP,

    2017 LAN, WAN

Etienne


Not sure what you mean but is it possible ?. Yes all designs are possible. Are the 3560 switches clustered or not ?


Certainly either design 2 or 3 is better than design 1 for obvious reasons ie. the failure of the right hand 6500 in D1 takes out all the access switches.


Design 3 has better potential throughput from the 3560's to the 6500 especially if you "load-balanced" odd and even vlans across the links. Note i'm assuming you are proposing to use L2 from 3560's to 6500's ?


Edit - sorry, for some reason i thought Etienne had posted the original thread. My mistake.


Jon

Actions

This Discussion