CUCM 6.1 backup scheduler resets "start backup" date

Unanswered Question
Mar 6th, 2009

We have a situation where many CUCM servers reset the backup scheduler "start backup" date to a future date in 2009 (apparently random!). As a result, the weekly scheduled backups stopped and the last good backups were performed some time around January. Obviously, there is no error logged in history since there is no backup attempt. Once I reset the backup date to a date in the past, the scheduled backups resume fine.

I have a TAC case opened and they are looking into this but i was wondering if anybody else experienced the same issue. versions range from to 6.1.3.

thanks for your input.

I have this problem too.
0 votes
  • 1
  • 2
  • 3
  • 4
  • 5
Overall Rating: 0 (0 ratings)
sebastien_michelet Wed, 03/11/2009 - 11:32

Could somebody check their DRS backup scheduler (assuming it was setup in 2008) and tell me if it is still working? I can't believe I would be the only one having this issue on more than 10 systems :)