I am doing a detailed design for a client. But i am finding hard to get the

FAT - Factory Acceptance Testing for

6500, 3750, 3560, Call Manager 7816, IPT 7960, 7941

SAT - Site Acceptance Testing 6500, 3750, 3560, Call Manager 7816, IPT 7960, 7941

Any help in this highly appreciated.

Regards

Saurav

I have this problem too.
0 votes
  • 1
  • 2
  • 3
  • 4
  • 5
Overall Rating: 0 (0 ratings)
Loading.
drolemc Fri, 04/17/2009 - 07:16

After the components are configured and integrated with other Cisco IP telephony applications, the field engineer prepares the system for the user acceptance test. Test scripts are run and compared against expected results. Any variability in network performance is noted and addressed before the user acceptance test.

http://www.cisco.com/iam/unified/ipt701/SMB/Conduct_User_Acceptance_Testing.htm

naresh-rathod Mon, 05/30/2011 - 02:23

Hi Saurav,

Did you found anything related to FAT, Please share, I am also facing same issue related to FAT

Thanks & Regards,

Naresh Rathod

Actions

This Discussion