cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
1923
Views
0
Helpful
1
Replies

STP root bridge change

bapatsubodh
Level 1
Level 1

Hi,

If in a already converged STP network if we introduce a new switch with lower priority will it force the full network to run the STP all again?

Or STP will hold the currently elected root as the root bridge even after adding a new switch with lower priority? In this case how do we force all switches in the network to recalculate new root bridge? Does this recalculation has a big impact on network or it is recomended to do the activity only with scheduled down time?

Please share the experience.

Any link on cisco.com?

Thanks in advance

Subodh

1 Reply 1

Jon Marshall
Hall of Fame
Hall of Fame

bapatsubodh wrote:

Hi,

If in a already converged STP network if we introduce a new switch with lower priority will it force the full network to run the STP all again?

Or STP will hold the currently elected root as the root bridge even after adding a new switch with lower priority? In this case how do we force all switches in the network to recalculate new root bridge? Does this recalculation has a big impact on network or it is recomended to do the activity only with scheduled down time?

Please share the experience.

Any link on cisco.com?

Thanks in advance

Subodh

Subodh

A switch with a lower priority will indeed force the network to reconverge. If it has a lower priority than any existing switch then yes it will become the root bridge.

Definitely do this in a scheduled downtime, you do not want an STP reconvergence during core production hours.

Jon

Getting Started

Find answers to your questions by entering keywords or phrases in the Search bar above. New here? Use these resources to familiarize yourself with the community:

Review Cisco Networking products for a $25 gift card