01-18-2010 07:39 AM - edited 03-06-2019 09:20 AM
Hi,
I need to create a switch stack with two 3750G switches. What's the best way to do this?
Thanks
01-18-2010 07:53 AM
Hi
The stacking configuration done automatically when you are connect the stack cable back side of the switch
the connection will be like this
switch 1 stack port 1 need to connnect switch 2 stack port 2
the same vise versa switch 1 stack port 2 need connect switch 2 stack port 1
If you want one switch always act as a master you can set the priority to the switch
conf t
switch 1 priority 5 ( you can set any number should be highest number in the stacked switches )
regards
krishna kumar
01-18-2010 08:57 AM
Hello Darren,
After stacking them, decide witch switch you want to be the master and give that one a higher priority. The priority is from 1 to 15 with 15 being the highest.
Also make sure you run the same exact IOS on both switches.
Please refer to this document for more info:
HTH
Reza
Find answers to your questions by entering keywords or phrases in the Search bar above. New here? Use these resources to familiarize yourself with the community: