CAD failover problem

Unanswered Question
Jun 30th, 2010
User Badges:

Hi

I am facing a problem with the CAD Services failover to secondary server were some of the agent desktop features go inactive.The setup is a UCCE 7.5 Split rogger model and the CAD services are running on the Pg box.All the icm components are running on 7.5(8)

On shutting the CAD Services on the primary server features like chat,enterprise data  goes inactive.This remains down till the services on CAD Primary have been brought up.Attached is the snap of the agent desktop on failure.

  • 1
  • 2
  • 3
  • 4
  • 5
Overall Rating: 0 (0 ratings)
Loading.

Actions

This Discussion