Replace a switch in 3750 switch stack.

Unanswered Question
Jun 11th, 2011
User Badges:

Hi all,

Can some one give me detail guide line how to replace a switch in a 3750 stack ? The replacement switch will be same model and IOS version with the fail switch. Also the fail switch is not a master. And I would like the replacement swith to take the stack member number and host interface configuration of the fail switch.

Thank in advantage.

  • 1
  • 2
  • 3
  • 4
  • 5
Overall Rating: 0 (0 ratings)
Loading.
Reza Sharifi Sat, 06/11/2011 - 20:43
User Badges:
  • Super Bronze, 10000 points or more
  • Cisco Designated VIP,

    2017 LAN

Hi,


Follow this link to add a new switch to your stack:


http://www.cisco.com/en/US/docs/switches/lan/catalyst3750/software/release/12.2_25_see/configuration/guide/swstack.html#wp1177470



This example shows how to provision a Catalyst 3750G-12S switch with a stack member number of 2 for the switch stack. The show running-config command output shows the interfaces associated with the provisioned switch:


Switch(config)# switch 2 provision WS-C3750G-12S



HTH

ranraju Sun, 06/12/2011 - 11:03
User Badges:
  • Cisco Employee,

Hi,


The configurations of the ports for the faulty switch would still be present on the master switch so you need not worry about the host interface configurations.


But all you have to keep in mind is, to power off the new switch and connect this switch into the stack in the place of the old faulty switch  and then power it on.


However you have to make sure that the new switch is running the same version of code as others in the stack.


Hope this helps,

Regards,

ranraju

(TAC)

xuanhuymai Sun, 06/12/2011 - 20:54
User Badges:

Hi Ranraju,

For instance, switch 2 needs to be replaced. On the new switch before connect it to the stack, do i need to do:


switch 1 renumber 2

copy run start


Power it off, then connect stackwise cable.


Regards.

Actions

This Discussion