A new site Install consists of majorly 3 steps
1. Adding the PG configuration in PG Explorer
2. Run the Router setup to enable DMP
3. Run ICM setup in PG
However I wanted to check in Step 1 and Step 2 interchangeable ?
What is the recommended flow and what are the issues in not following the sequence.
Thanks
Alok