setup job with max instances

Unanswered Question
Sep 20th, 2013
User Badges:

Hi,


I wanted to know how to configure a job so that it will have max n instances running all the time. I have tried running my job every 5 mins and job option is set to "run anyway" but that schedules lot of job in parallel.


Regards,

Gurmeet

  • 1
  • 2
  • 3
  • 4
  • 5
Overall Rating: 0 (0 ratings)
Loading.
Tracy Donmoyer Mon, 09/23/2013 - 16:04
User Badges:

Depending on what you are trying to accomplish you may be able to do it using Resources.


Create a Resource with a limit of n.  Add the resource to the job and specify an amount needed of 1.  This will limit you to a maximum of n occurrences of the job running at any time.

Lumi Mihalcea Tue, 09/24/2013 - 10:42
User Badges:

You can set up a job with only the beginning time, let's say midnight - no end time then in Repeats you can select Rerun same occurrence and Repeat every n minutes (do not specify # of times). This will run starting at midnight, every 5 minutes, n times until 11:59 pm. I hope this is what you're looking for.