04-24-2017 01:06 PM - edited 03-17-2019 10:08 AM
I'm involved in a project with moving an existing 10.x ccm into a new location
I'm thinking of the following
Build
Build a duplicate cluster
Same IP and Mac addresses as the production
Hide the new cluster with NAT
Back up and restore the existing cluster onto the new cluster
Test new infrastructure
Migration
Shut down existing cluster
Remove NAT configuration
Advertise the new cluster
Is this the recommended way, any suggestions
Can, should I use Prime?
Thanks
04-24-2017 10:19 PM
Hi,
Yes, the plan you described will work. You can use Prime Collab Deployment as well, specially if you use the 'Network Migration' where you have the option to migrate to new cluster with a change in the the Ip address / hostname , so that both clusters can be active simultaneously as per your requirement. You may check the PCD admin guide for details
http://www.cisco.com/c/en/us/td/docs/voice_ip_comm/cucm/pcdadmin/10_5_2/CUCM_BK_P7081B13_00_pcd-administration-guide-1052/CUCM_BK_P7081B13_00_pcd-administration-guide-1052_chapter_010.html
HTH
Manish
04-24-2017 10:26 PM
It won't work straight forward as you think.
The new cluster will come wit new set of certificates. This means that your phones won't register with the new cluster. You need to clear the ITL file to get a new one and register. You need a tool such as UnifiedFX to manage this.
What you can do is build new subscriber at different geo location to join the same cluster. Then before you turn off the cluster at site#1 change cucm server group order to make the phones register at the new sub. Once you verify that they are registered, you can move the old cluster to the new site and turn them back on. Finally change cucm server group order back to the way you want.
Prime network migration can be used as second option