daniel.bowen Fri, 04/05/2002 - 07:17
User Badges:

A Supervisor III engine will support layer 3 switching yes. What router will you be using?

Do not confuse Layer 3 switching with MLS. MLS requires the first packet of every flow to be routed, it then caches the properties and switches the rest. The requirements are either a 5000 or 6000 series switch, a 3600 - 7500 series router, Sup III with NFFC and software 5.1 on Cat. Do you have all of this?


Daniel,

Actions

This Discussion