Hello,

We have a wireless controller connected to a core switch via two port bundled together to form a port channel 2.

There is a plan to shut down the switch ports connected to controller for some testing.

Is it advisable to shut the individual ports(eg.gig1/6 & gi1/7) from the switch side or to do a shutdown on the interface Po2.

Appreciate all inputs.

2 REPLIES
VIP Purple

port channel shutdown or individual ports

Always better to shutdown the physical ports & once you done with WLC testing you can enable switchport again.

HTH

Rasika

**** Pls rate all useful responses ****

New Member

I think you should shut down

I think you should shut down the port-channel first, because when you shut it down, its member ports will go "admin down" too.