%C4K_REDUNDANCY-5-CONFIGSYNC

We are getting this message every hour, how can we stop it without affecting the switch (4507R) operation..

Apr 1 09:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Apr 1 10:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Apr 1 11:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Apr 1 12:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Apr 1 13:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Apr 1 14:29:40: %C4K_REDUNDANCY-5-CONFIGSYNC: The calendar has been successfully synchronized to the standby supervisor

Thanks in advance..

3 REPLIES
Hall of Fame Super Blue

Re: %C4K_REDUNDANCY-5-CONFIGSYNC

Hi

This message is level 5 in syslog ie. notifications. If you want to stop seeing it you can raise your logging level to warnings but be aware that you may miss other information you would like to see.

Attached is link to all 4500 redundancy syslog messages and their levels.

http://www.cisco.com/en/US/products/hw/switches/ps4324/products_system_message_guide_chapter09186a00801d0f38.html#1371982

HTH

Jon

New Member

Re: %C4K_REDUNDANCY-5-CONFIGSYNC

Thanks for your response.. I think I intrested more in knowing why we are getting this message every hour and how we can stop rather than hiding it..

New Member

Re: %C4K_REDUNDANCY-5-CONFIGSYNC

this is interesting. The calendar and VLAN database files are always synchronized when they change. you shouldn't be getting this if nothing is changed.

1000