07-29-2009 10:59 PM - edited 03-06-2019 07:00 AM
Dear
I want to add new L3 3750-24TS in my existing stack.I have 2 swithces in stack(3750 12-s and 3750 24-TS).
Please help me.How can i add and what configure i have to do in new l3.
07-29-2009 11:04 PM
Please read the stuff below for adding a switch to a stack:
-amit singh
07-30-2009 05:31 AM
This is how I add a switch to a stack.
start with makeing shure the same software are on the switches.
erase all configurations on the switch you want to install.
Add the two stack cables to the stack.
Add the powerless switch you want into the stack by connectiong the two stack cables
Add powercable and power on the new switch.
this normally works, but once it totally crashed the stack and there seemed to be no reason for it and i have found no reason for it to do so.
HTH
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide