We have a stack of 3 cisco swithes 3750s
WS-C3750G-24TS 12.2(25)SEB4
We plan to recover a switch from the stack as it is not needed any more The switch we plan to recover is the existing Master.
If we change the priority (switch 1 priority) and make another switch the master using command line will we have any loss of connectivity to the servers conecting to the stack ?
Any help is much appreciated