01-14-2008 01:17 PM - edited 03-05-2019 08:28 PM
Do I have problems when I'm running on all the switches RSTP (see fig) ? CORE switches are 6500 connected via a channel, 3560 are stacked with yellow cable and one 3560 is connected via fiber to CORE1 and the other 3560 to CORE2
CORE1 |==================| CORE2
3560 |---------stack cable----------| 3560
01-14-2008 03:59 PM
There should be no problem running rpvst . The 3560's are not stacked , they don't have a stack cable like the 3750's do . They are probably using a sfp gbic cable to daisy chain the switches together .
01-16-2008 01:07 PM
Thanks Glen,
Now I have a confirmation what I was thinking. The cable is the yellow one with the 2 SFPs
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide