I have a new switch and want to
connect to production network, i have configured the new switch VTP
domain, password and VTP version same as production switch.
Changed
the mode to client mode, but if i keep the bridge priority as 4096
will this impect the spanning traffic flow. I thing yes as VTP and STP
are two different protocol. Need expert confirmation..
Regards:
Amar
Hi Amar,
Yes you are right, VTP and STP are 2 different protocols both are having different funcionality as STP is used to maintain a layer 2 loop free network where as VTP is used replicate the vlan across the switches.
STP can impact VTP while STP is re/calculating the root switch and topology, and the network has not yet converged. In such case VTP cannot be replicated across the rest of the switches.
Hope to Help !!
Ganesh.H