11-18-2013 03:22 PM - edited 03-07-2019 04:39 PM
Gents
i am deploying VSS and have follwoing equipment
cisco 6509E
Dual redudnant VS-S2T-10G
I have also ordered WS-X6908-10G-2T card for floor swicthes uplink
can someone pelase tell me how i shd do the cabling for VSS (between two switches)
Thanks heaps
11-18-2013 03:23 PM
1. You need a VSS heartbeat link. Recommend you use 1Gbps fibre.
2. For VSS link, you can use the supervisor's on-board 10 Gbps link and/or combine with 6908 10 Gbps ports.
11-18-2013 05:24 PM
Hi,
Also, have a look at figure 4-5 in this link for VSL connectivity with quad sups.
http://www.cisco.com/en/US/docs/switches/lan/catalyst6500/ios/12.2SX/configuration/guide/vss.html
HTH
11-18-2013 05:38 PM
Hi Guroo,
You need a Tengig connection from each supervisor module on one chassis to other chassis. Only Tengig connections can be used as VSL links.
Thanks & Regards,
Karthick Murugan
CCIE#39285
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide