What would be the Optimal CER Design for the following configuration?
Building has 13 Floors.
Each floor may have more than 1 IDF
No.of Cisco Phone Users: 2000 (Initial)
Single CCM 4.1(3) Cluster with (3) Servers.
Publisher, (2) Subscribers.
How many CER should be implemented with the optimal version.
Thanks,