02-11-2007 11:26 PM - edited 03-13-2019 03:55 PM
I have a WAN link between our two sites is coming up that will terminate on VWIC-2MFT-G703 card on both sides. I have 2811 on both sides. When I installed the G703 card, it showed up as E1 controller. For its initialization, I issued the following commands under E1 controller configuration:
channel-group 0 unframed
linecode hdb3
clock source internal
Doing so created a serial interface on the router. I gave the IP to this interface. Do I need to do anything else before terminating the circuit?? Thank You in advance.
Sheeraz
Solved! Go to Solution.
02-12-2007 02:04 AM
Hi
This minimal config is enough to get started..
Once you have ur line terminated you can check the status of the line including errors/reliability etc.,
regds
02-12-2007 02:04 AM
Hi
This minimal config is enough to get started..
Once you have ur line terminated you can check the status of the line including errors/reliability etc.,
regds
Find answers to your questions by entering keywords or phrases in the Search bar above. New here? Use these resources to familiarize yourself with the community: