Since I upgraded my L3 switches to 12.1(8b) E9, on May 18, I'm getting " Policy routing matches: 0 packets, 0 bytes on a 'show route-map command". I'm using (1) MSFC2 module in each of my L3 switches.
The Catalyst version is 6.3(5).
The policies DO work as configured,(end-users are happy)., but I'm wondering if this is another bug or if I'm missing something in my configuration.