11-13-2001 09:45 AM - edited 03-01-2019 07:21 PM
I need some help on a design issue. I have a wiring closet with at least 10 Catalyst 2924's in it. I need to know what it the best way to connect all them. The scenerio is this: A 1750 Router connected to port one of switch 1. I then put all the crossovers into the following ports. Port 2 would go to port 1 on switch 2. Port 3 would go to port 1 on switch 3. I follow this till I have all of the crossovers patched into the top switch. I would like to know if this is recommended or should I link them another way. Your thoughts and suggestions would be greatly appreciated. Thanks,
11-13-2001 10:07 AM
That will work. how many active stations ?
11-13-2001 10:38 AM
At this site approx 180 plus 20-30 printers through out the floor. Then servers we got 4-5 servers. Thanks.
Find answers to your questions by entering keywords or phrases in the Search bar above. New here? Use these resources to familiarize yourself with the community: