cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
313
Views
0
Helpful
1
Replies

Management traffic load over the WAN

hezia
Level 1
Level 1

Management process(include monitoring and security) with the central WCS system will cause Management traffic over the WAN links.

Can you tell me more about the traffic load over the WAN links if we will use it as only as Wifi detection and prevention system(inclue location and not for wireless services..for now).

We will use 150 air-AP1000(lwapp)on AIR-MONITOR mode over the WAN and 4400 controllers one in each remote sites(10 sites).

1 Reply 1
Review Cisco Networking products for a $25 gift card