Cisco Support Community
cancel
Showing results for 
Search instead for 
Did you mean: 
Announcements

Welcome to Cisco Support Community. We would love to have your feedback.

For an introduction to the new site, click here. And see here for current known issues.

New Member

Prime 2.1 - Reporting

hi@all,

 

we have a new Prime 2.1 deployment.

In the past we had a WCS with 7.0.240, at this we have configured some reports as .csv export.

At the new Prime we have done it in the same way, generate for example a report for the client-count, set it to .csv and insert the email-address.

 

The problem is, we don't get .csv files in the email, we get zips (in the zips are csv, but this we haven't chosse). Thats not so good, because this csv is for a secondary data-systems for external reports.

So could we disable this zip files and get our old cvs back?

 

kind regards

  Rene

3 REPLIES
Cisco Employee

Might be due to code issue.

Might be due to code issue. Will verify & update you.

New Member

I'd also like to see if the

I'd also like to see if the files can be emailed with just the csv file and not zipped together.  Also I know it can send the files in pdf format but you can't sort off a pdf and thus the CSV file type becomes much more useable.

Any fix for this?

Joe

Creating, Scheduling, and

Creating, Scheduling, and Running a New Report

To create, schedule, and run a new report:


Step 1 Choose Report > Report Launch Pad .

Step 2 Choose a category from the left sidebar menu to see the report types for each report category, select the check box for the appropriate report in the main area of the Report Launch Pad, then click New .

Step 3 In the Report Details page, complete the fields as described in the Report Launch Pad > Report Type > New section in the Cisco Prime Infrastructure 2.1 Reference Guide . Parameters shown in the Report Details will vary with the report type. With some reports, you will need to customize the report results. See Customizing Report Results.

Step 4 If you plan to run this report later or as a recurring report, enter Schedule parameters as described in the Report Launch Pad > Report Type > New section in the Cisco Prime Infrastructure 2.1 Reference Guide .

Step 5 To run the report, choose one of the following options:

  • Run—Click to run the report without saving the report setup.
  • Save—Click to save this report setup without immediately running the report. If you have entered Schedule parameters, the report runs automatically at the scheduled date and time.
  • Run and Save—Click to save this report setup and run the report immediately.
  • Save and Export—Click to save the report, run it, and export the results to a file. You will be prompted to:

Select the exported report’s file format (CSV or PDF).

Choose whether to send an email when the report has been generated. If you choose this option, you must enter the destination email address and the email subject line content, and choose whether you want the exported file included as an attachment to the email.

When you are finished, click OK .

  • Save and Email—Click to save the report, run it, export the results as a file, and email the file. You will be prompted to:

Select the exported report file format

Enter the destination email address and the email subject line content

When you are finished, click OK .

  • Cancel—Click to return to the previous page without running or saving this report.


 

 

If a report has been saved for a specific report type, you can access the current reports from the Report Launch Pad.

118
Views
5
Helpful
3
Replies
CreatePlease login to create content