Cisco Support Community
cancel
Showing results for 
Search instead for 
Did you mean: 
Announcements

Welcome to Cisco Support Community. We would love to have your feedback.

For an introduction to the new site, click here. If you'd prefer to explore, try our test area to get started. And see here for current known issues.

New Member

UCS Server Configuration

Dear Techies,

I have received the following requirement from one of our customers.

********************************************************************************************************************

Required Blade Server as per following specs:
Location -1
 
Server Qty = 4
Intel® Xeon® processor
2 x Intel(R) Six Core Xeon(R) CPU
Processor Speed 2.6GHz ,Cache Memory 20MB cache
Intel C600 Chipset
32GB Memory, 1333MHz, Dual Ranked RDIMMs
2 x 300GB 15K RPM SAS Hotplug 2.5” HDD
H310 Raid Controller for RAID 1
Broadcom 57810-k Dual port 10Gb KR Blade NDC            
Broadcom 5719 Quad port 1GBE Mezz Card
Storage requirement is as following:
 
1.       Data  Storage requirement for Call Recording with Screen Capture for one month will be 1.2TB (3 years retention)
2.       Data Storage requirement for Application and Reporting will be 50 GB per year. (3 years retention)
 
Location -2
 
Server Qty = 3
Intel® Xeon® processor
2 x Intel(R) Six Core Xeon(R) CPU
Processor Speed 2.6GHz ,Cache Memory 20MB cache
Intel C600 Chipset
32GB Memory, 1333MHz, Dual Ranked RDIMMs
2 x 300GB 15K RPM SAS Hotplug 2.5” HDD
H310 Raid Controller for RAID 1
Broadcom 57810-k Dual port 10Gb KR Blade NDC            
Broadcom 5719 Quad port 1GBE Mezz Card
Storage requirement is as following:
 
1.       Data  Storage requirement for Call Recording with Screen Capture for one month will be 1.2TB (3 years retention)
2.       Data Storage requirement for Application and Reporting will be 50 GB per year. (3 years retention)

******************************************************************************************************************

 

Based on that, I have tried to prepare a sample configuration (Attached) which needs to be checked thoroughly since I have prepared it first time with my best knowledge.

Kindly have a look at the configuration technically and provide your opinion. If there are any issues, please let me know.

Your kind and prompt response will be highly appreciated.

Regards,

Farhan.

  • Unified Computing
3 REPLIES
New Member

Hi , Do you want  to know the

Hi ,

 

Do you want  to know the  configuration paramenters or need to confirm the attached  BOQ is fine  for the  customer requirement  

 

New Member

Hi Dinesh,Please confirm the

Hi Dinesh,

Please confirm the attached BOQ if its is technically meeting all the points.

Regards,

Farhan.

New Member

configuration parameters 

configuration parameters 

82
Views
0
Helpful
3
Replies
This widget could not be displayed.