cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
893
Views
0
Helpful
2
Replies

Catalyst 3560 TCAM exhaustion due to number of routes.

p.devalck
Level 1
Level 1

Recently the CPU load of a 3560G L3 switch has been increasing, especially since the activation of ipv4-and-ipv6.

The sdm preference had to be adapted accordingly.

As a result the number of IPv4 routes has been restricted resulting in some software routing.

'show platform tcam utilisation' indicates use of 513 directly ipv4 routes out of 4352 possible ones en 1313 indirectly ipv4 routes out of 1472 possible ones.

This indicates exhaustion for the indirectly ipv4 routes.

Is there any way to shift capacity from direct ipv4 to indirect ipv4 routes ?

The options for "sdm prefer xxx" seem fairly limited.

Throughput on the 3560G is not an issue at the moment.

If ipv4-and-ipv6 combination does not scale well in number of routes (several 1000s),

what platform has higher TCAM capacity for routes (mixed ipv4 - ipv6) ?

Do we need to migrate all switches to a chassis-based type of switch (space is limited, so it may not be possible) ?

The network is still expanding, as is the number of routes.

Any suggestions ?

2 Replies 2

Jose Jara
Level 3
Level 3

Why do not summarize to reduce the size of the RIB ?

Joseph W. Doherty
Hall of Fame
Hall of Fame

Disclaimer

The   Author of this posting offers the information contained within this   posting without consideration and with the reader's understanding that   there's no implied or expressed suitability or fitness for any purpose.   Information provided is for informational purposes only and should not   be construed as rendering professional advice of any kind. Usage of  this  posting's information is solely at reader's own risk.

Liability Disclaimer

In   no event shall Author be liable for any damages whatsoever (including,   without limitation, damages for loss of use, data or profit) arising  out  of the use or inability to use the posting's information even if  Author  has been advised of the possibility of such damage.

Posting

3560G TCAM resources aren't extremely generous to begin with, and using IPv6 can use up TCAM very quickly.

I recall one of the later 12.2 IOSs (58?) provides an additional IPv6 SDM template.  Unsure it's also available on the original 3560 series too.  If available, however it divides the TCAM, TCAM resource might be still be unsuitable for your needs.

Another approach would be to use whatever route summarization is possible to reduce the number of routes your 3650s need to have.

If you're looking to upgrade, the 3650X can be tight on TCAM too.  Besides chassis solutions you might want to look at the 4900 series.

Getting Started

Find answers to your questions by entering keywords or phrases in the Search bar above. New here? Use these resources to familiarize yourself with the community:

Innovations in Cisco Full Stack Observability - A new webinar from Cisco