08-04-2010 10:48 AM - edited 03-04-2019 09:18 AM
Scenario: 2 online CRS-1(16slots)
Task: install new CRS-MSC-40-B, SIP-800
after I installed the MSC, if I noticed LED status goes GREEN, what I need to do next or that's all ?
I found license in my goods list, I don't know whether I need use it in somewhere.
thank you for your advices & share you field experience , to avoid unnecessary adventure.
08-04-2010 12:27 PM
Hello Costail,
>> Use the Status LED, located on the MSC faceplate, to verify the correct installation of the MSC:
•When the MSC is properly installed, the Status LED turns green. If this LED is off, verify that the MSC is installed correctly.
•If a failure occurs during the board boot sequence, the two four-digit alphanumeric LED displays indicate the current boot phase to assist you in debugging the board failure.
I agree you should be fine if you see the LED becoming steady green
to be noted: in a recent thread has been pointed out that if we install an empty MSC with no SPA, the system does not start IOS XR on it as there is no need to run IOS XR if no external interfaces are available.
Hope to help
Giuseppe
08-04-2010 10:14 PM
thank you giuslar
I think your suggestions would be useful.
and can you say sth. about the license? Must I send it to IOS XR ? If yes , HOW ?
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide